The documents below are from the previous cooperative agreement and have been made available for reference.
These documents are historical and provided for reference purposes only. They are not to be used for any new submissions. To access and apply for any newly announced RFPI’s, click here.
Title | Size | Hits | Date modified | Download |
---|---|---|---|---|
Separator Shut Down Procedure | 28.78 KB | 1483 | 11-18-2021 | DownloadPreview |
Abuse Test Procedure Manual | 1.45 MB | 2976 | 01-19-2022 | DownloadPreview |
48 Volt Mild Hybrid Electric Vehicles Test Manual | 1.67 MB | 3204 | 09-29-2021 | DownloadPreview |
System Configuration Guidelines | 563.52 KB | 1407 | 11-18-2021 | DownloadPreview |
Electric Vehicle Battery Test Procedures Manual | 797.70 KB | 7246 | 09-20-2021 | DownloadPreview |
12 V Start Stop Manual | 1.37 MB | 1319 | 09-20-2021 | DownloadPreview |
PHEV Manual | 1.38 MB | 1611 | 09-20-2021 | DownloadPreview |
Appendix - Developer/National Laboratory Deliverable Checklist | 422.59 KB | 1346 | 09-20-2021 | DownloadPreview |
Title | Size | Date modified | Download |
---|---|---|---|
USABC Cost Model_2020 | 273.56 KB | 11-10-2021 | Download |
Title | Size | Date modified | Download |
---|---|---|---|
USABC Cooperative Agreement Terms and Conditions (Redacted) | 446.14 KB | 11-10-2021 | DownloadPreview |
USABC Purchase Order Terms and Conditions | 102.32 KB | 11-10-2021 | DownloadPreview |
USABC/DOE Intellectual Property Provisions | 296.90 KB | 11-10-2021 | DownloadPreview |